MENU

Overseas Economic and Trade Zones

Home >Members & Products >Products List > Thick CLevel Car Carpet

The Tehran Metro Line 1&2

Member Details

CITIC INTERNATIONAL COOPERATION CO., LTD.

Beijing,China,Asia

  • Chinese Supplier

  • CCCME Member,Vice-President Company

  • Product Details
  • Company Profile

 The Tehran Metro Line 1&2, length of approximately 46 km, with 43 stations, to cross the north-south and east-west through downtown. CITIC company general contracting electrical system includes a high pressure, vehicle DC traction system of lighting and power transmission and distribution network, communication signal and control system, station and tunnel ventilation system, vehicle section and overhaul plant a total of five subsystems, is responsible for the design, equipment supply, installation and commissioning work, contract total amount 293000000 dollar. In China People's insurance company support, fourteen of the country's main commercial banks for the project to provide the buyer credit. In 2001 September, CITIC and Tehran urban railway company on the project new project signed contract modification of Contract No. fifth, for a total of $92050000. In 2002 March, the import and Export Bank of China for the project to provide 85% preferential government loans. After Yi the joint efforts of both sides, since 2000 February a project is completed so far, with a total of 6 in all 38 kilometers opened and put into commercial operation, daily passenger transport is close 1 million person-time, achieved good social and economic benefits. The whole project was completed in 2006 March opened.

Send your message to this member

  • From*
    toLIUBEIMEI/ZHANGWEI
  • Message*

Specialized Industries

  • South Iran aluminum plant

    South Iran aluminum plant

  • Import and export of goods

    Import and export of goods

  • Construction project ( project ) safety evaluation

    Construction project ( project ) safety evaluation

  • Xian Yuxi iron and steel plant in 75t / h gas boiler engineering

    Xian Yuxi iron and steel plant in 75t / h gas boiler engineering

  • The phase three project of Jiaxing power plant

    The phase three project of Jiaxing power plant

  • Double stand cold rolling mill in Jigang

    Double stand cold rolling mill in Jigang