MENU

Overseas Economic and Trade Zones

Home >Members & Products >Products List > Thick CLevel Car Carpet

Cambodia Preah Vihear Rowan to Kiri Sakor Railway and Mahlo Port Project

Member Details

CHINA RAILWAY INTERNATIONAL GROUP

Haidianqu,Beijing,China,Asia

0

  • Chinese Supplier

  • Member of CCCME Council

  • Product Details
  • Company Profile

This project includes Preah Vihear Rowan to Kiri Sakor Railway, Mahlo Port Bridge and port Mahlo. Preah Vihear Railway Project stretches from Preah Vihear Rowan mine to the north,
passes through the Kampong Thom, Kampong Chhnang and Kampong Speu southward in sequence, finally reaches at the Samit Port in Koh Kong and connects with the railway unloading yard and Pineapple Island harbor by Samit Port Bridge, with a total length of 404.481 km. CRIG is responsible for the design and survey works.

Send your message to this member

  • From*
    toDavid
  • Message*

Specialized Industries

  • Coal to Methanol

    Coal to Methanol

  • Monocrystalline Solar Panel-MONO125*125 80W-100W

    Monocrystalline Solar Panel-MONO125*125 80W-100W

  • Bengal 29 substation project

    Bengal 29 substation project

  • Large rotary kiln combustion and temperature contr

    Large rotary kiln combustion and temperature contr

  • slab casting engineering

    slab casting engineering

  • MLK MLN Vertical Roller Mill for Slag

    MLK MLN Vertical Roller Mill for Slag