MENU

Overseas Economic and Trade Zones

Home >Members & Products >Products List > Thick CLevel Car Carpet

Cambodia Preah Vihear Rowan to Kiri Sakor Railway and Mahlo Port Project

Member Details

CHINA RAILWAY INTERNATIONAL GROUP

Haidianqu,Beijing,China,Asia

0

  • Chinese Supplier

  • Member of CCCME Council

  • Product Details
  • Company Profile

This project includes Preah Vihear Rowan to Kiri Sakor Railway, Mahlo Port Bridge and port Mahlo. Preah Vihear Railway Project stretches from Preah Vihear Rowan mine to the north,
passes through the Kampong Thom, Kampong Chhnang and Kampong Speu southward in sequence, finally reaches at the Samit Port in Koh Kong and connects with the railway unloading yard and Pineapple Island harbor by Samit Port Bridge, with a total length of 404.481 km. CRIG is responsible for the design and survey works.

Send your message to this member

  • From*
    toDavid
  • Message*

Specialized Industries

  • Nanyang Yahekou 2×350MW power plant

    Nanyang Yahekou 2×350MW power plant

  • LB5000(bin aside mixing tower)

    LB5000(bin aside mixing tower)

  • GHK-Z2000

    GHK-Z2000

  • 2000m trailer rig [ Conventional Drilling - 2000 Meters ]

    2000m trailer rig [ Conventional Drilling - 2000 Meters ]

  • Tinaco Anaco Railway of Venezuela

    Tinaco Anaco Railway of Venezuela

  • Wangpo Coal Mine (Owned by CCTEG)

    Wangpo Coal Mine (Owned by CCTEG)