MENU
China Chamber of Commerce

Overseas Economic and Trade Zones

Confirm
Cancel
x

Ok
x
Sign into your account
Member ID or Email
Join Free
  • Product Details
  • Company Profile

Jinniuping hydropower station is the Gui Jiang River comprehensive utilization planning 6 steps of fourth steps. Site is located in middle and lower reaches of the Gui Jiang County horse town about 7 km upstream of Xiong Bucun. The project by the county

  Jinniuping hydropower station is the Gui Jiang River comprehensive utilization planning 6 steps of fourth steps. Site is located in middle and lower reaches of the Gui Jiang County horse town about 7 km upstream of Xiong Bucun. The project by the county wide power limited company invests 540000000 yuan of build, with a total installed capacity of 3 60MW, selection of installed capacity of 20MW tubular turbine unit, generating 2.7 kwh build manhood. Design for many years the average amount of 241600000 kwh electricity. Sluice gate with flap gate, which in the Gui Jiang series is the first ship lock construction.

The project on 2004 start in October; in September 28, 2006 to achieve successful river closure; December 8, 2006, station of the test is successful. In January 31, 2007, formally installed generating units. 1, 2, 3 aircrew respectively in 2007 May, August, December put into power generation.

Project is completed, effectively reduces the pressure in Guangxi power grid, to accelerate prefectural region economy development and lay a solid foundation for improving the energy, Guangxi power grid distance to Wuzhou, Hezhou city power supply condition. At the same time to increase the county fixed assets investment, tourism, traffic, transportation and other industries play a role.

Send Inquiry to This Supplier

  • Title
  • From*
  • toLIANG YI
  • Message*
  • Minimum Order Quantity*
  • Unit
  • Verification Code*